A 22 kW three-phase AC charger for businesses, strata car parks and fleets, installed with honest advice on vehicle limits, since most cars accept 11 kW AC or less.
From $3,490 (Supplied and installed), including GST. Indicative starting price: the final fixed price is confirmed in writing after a site assessment.
A 22 kW AC charger is the highest-power AC charging option commonly installed at Australian properties. It draws 32 A on each of three phases, so it needs a strong three-phase supply. It suits businesses, strata car parks and fleet depots where many different vehicles will use the same charger over its life, and where at least some of those vehicles can genuinely use 22 kW.
A supplied and installed 22 kW AC charger starts from $3,490. This is an indicative starting price; the final fixed price is confirmed in writing after we check your supply capacity, switchboard and cable route.
Here is the honest part: most electric cars accept 11 kW AC or less, and some are limited to around 7 kW. A car limited to 11 kW charges at 11 kW on a 22 kW charger, no faster. A 22 kW unit still makes sense where some vehicles accept 22 kW AC, where chargers are shared by many users over time, or where future-proofing a site is worth the extra cable and supply cost. If an 11 kW charger would do the same job for your vehicles, we will recommend it instead. We also check that your main supply can carry the load without affecting the rest of the site.
Businesses, strata buildings and fleet operators with strong three-phase supply and some vehicles that accept 22 kW AC.
Vehicle limits: the car's onboard charger decides the charging rate. Check each vehicle's AC charging specification before choosing 22 kW.
Supply: 32 A per phase is a large load. Sites with limited supply may need load management or a supply upgrade, which can require network approval.
Strata: chargers on common property need owners corporation approval, and billing arrangements for residents should be agreed first.
Price drivers: cable size and run length, pedestal mounting, switchboard capacity, access control and network requirements.
1. Request a quote and list the vehicles that will use the charger.
2. We check supply capacity, the switchboard and the cable route on site.
3. You receive a fixed-price quote, with an 11 kW comparison where relevant.
4. Once approvals are in place, our licensed electricians install and test the charger.
5. We configure load management, access control and the app.
The price shown is an indicative starting price for a standard installation; the final fixed price is confirmed in writing after a site check and quote.
A three-phase supply with enough spare capacity is required; supply upgrades need network approval and are quoted separately.
Installations on strata common property require owners corporation approval before works start.
Actual charging speed is limited by each vehicle's onboard charger.
Long cable runs, trenching, civil works or switchboard upgrades are quoted separately.
Where we work
Timing
How your request works
Prices include GST.